
MIG/ MAG welding – 2 work areas
The operator prepares the object to be welded in the work area no.1. while the robot is welding in the work area no.2. When both are done, the operator leaves the work area no.1 and moves to the work area no.2 to collect the ready welded object. The robot moves to the work area no.1 and begins to weld. The operator then prepares the next object in the work area no.2 and the process is repeated.

Uses:
- Excavator buckets
- Machine parts
- Combine headers
- Transmission shafts
- Hydraulic cylinders
- Biomass boilers
The offer includes:
- Industrial robot FANUC ArcMate + welding functionalities
- Lincoln Electric welding power source Power Wave S500
- Anti-collision torch mounting
- 2-axis positioners with 1000 kg capacity
- Suspended linear motion track
- Robotic cell control system
- Wire feed tube, welding torch cooler
- Set of cables with a liquid-cooled welding torch
- Abicor Binzel cleaning station
- Work area with 1600 mm diameter
- Industrial fencing and safety systems
- Joint platform for robotic cell allowing for fast relocation